Story Construction – New Corporate Offices

In the fall of 2016 Converse Conditioned Air was approached to serve in a Design - Assist - Build capacity for the new corporate offices of Story Construction.  CCA’s design - assist responsibilities included budgeting several design options, providing valuable insight to the performance of the proposed final design, final pricing and installation of the final design.  Converse Conditioned Air self-performed 97% of all of the HVAC scope, including natural gas distribution piping and Building HVAC Controls.  The installed final product included zone control of the HVAC systems for ideal comfort, paint grip double-wall spiral ductwork, ducted return and powered exhaust at the packaged HVAC units.  Converse Conditioned Air used vendor relationships to gain better pricing and delivery times for the project.  This project was completed three weeks ahead of schedule.